Illustrative output
See the shape of a job pack.
This example shows the sections a contractor prepares and checks. It contains no approved site assessment or work instructions.
Project safety documents
Example project: sample retail fit-out · Prepared for demonstration only
Project, site, client, dates, workforce, interfaces and access restrictions supplied by the contractor.
Tasks, people at risk, hazards, existing and additional controls, and initial and residual ratings require site-specific input.
Work sequence, responsibilities, equipment, permissions, emergency arrangements and briefing details.
Product-specific use, current supplier SDS, exposure, controls, first aid and spill response, when substances are used.
Check all information against the actual work, amend it, approve the issue and brief the workforce before starting.
All five permit examples are included to show the available formats. A real pack includes only the forms selected for the actual activities.
- Hot Work Permit
- Confined Space Entry Permit
- Work at Height Permit
- Isolation / LOTO Permit
- Lifting Authorisation & Plan
The real output depends on the information entered and may include a COSHH briefing and original SDS appendix. This illustrative page and PDF are a preview of structure only.